Provision of Construction Services for Pipeline Corridor from FPF to CPF (Part E)

Contract No.: Norinco-EBS-049SC18-003

Contract price: 1,328,240.00 USD

Description:

Construction of the pipeline corridor from the First Production Facility (FPF) to the Central Processing Facility (CPF) (Part E) at the East Baghdad Oil Field. The scope included site preparation, earthworks, excavation, backfilling, grading, construction of pipeline corridor crossings, reinforced concrete civil works, drainage systems, utility crossings, access roads, and associated infrastructure. The works were executed in full compliance with project specifications, HSE requirements, and international quality standards, including surveying, testing, and preparation of As-Built documentation.